top of page

Achievements in the sector of

assembly

AdobeStock_1041089587.jpeg

Example of achievements

Assembly examples

Sector: assembly

Valve

rea_usinage_cuivre_elecconstruction-elec.jpg

Product: Assembled valve.
Description: Machined, assembled and tested valve assembly for the chemical industry.
Quantity produced: in series of 20 pieces, 300 pieces per year.
Manufacturing time: 10 weeks.
Machine used: machining center, digital lathe, tests and assembly carried out in air-conditioned assembly room.

Adaptation kit

rea_usinage_cuivre_elecconstruction-elec.jpg

Product: Medium voltage circuit breaker.

Description: machining, assembly, packaging and direct delivery to customer logistics platform 15 different kit references.

Quantity produced: 800 pieces/year.

Manufacturing time: 5 weeks.

Machine used: machining center, assembly carried out in air-conditioned assembly room.

Oil circulation indicator

rea_usinage_cuivre_elecconstruction-elec.jpg

Product: transformer.

Description: machining, assembly, watertightness testing, electrical testing carried out on our premises.

Quantity produced: 100 pieces/year.

Manufacturing lead time: according to annual delivery schedule.

Machine used: machining center, digital lathe, tests and assembly carried out in air-conditioned assembly room.

ASSEMBLY EXAMPLES

bottom of page